114. Memorandum From Jeffrey Starr
of the Delegation to the Nuclear and Space Talks in Geneva to the Arms
Control and Disarmament Agency (Lehman)1
SUBJECT
As requested, attached is the list of 32 issues which the Secretary and the
Soviet Foreign Minister agreed in April to attempt to resolve in Geneva
before the next ministerial. You should be aware also that Ambassadors
Burt and Nazarkin have agreed to expand the 32
issues list to 50 issues. The Delegation has drawn up a list of additional
issues and will begin discussions with the Soviets tomorrow on it. There is
no formal list of issues, internal or agreed, to be resolved by the time of
the summit; in fact, there has been some reluctance to draw up such a list.
Nonetheless, a list of other outstanding START issues is attached.
Attachment
Paper Prepared in the Delegation to the Nuclear and Space Talks in
Geneva2
32 ISSUES
As Agreed by The Secretary and The Soviet Foreign Minister
at the April Ministerial in Washington
- 1.
- Definition of new types of strategic offensive arms
- 2.
- Warhead attribution for future types of ballistic missiles
- 3.
- Basing terminology
- 4.
- Sublimits on mobile ICBM
launchers and on warheads on mobile ICBMs
- 5.
- Launchers on newly constructed submarines which have not yet begun
sea trials
- 6.
- Phasing of reductions of strategic offensive arms
- 7.
- Provisions regarding initial accountability under the
treaty
- 8.
- Prohibition on rapid reload
- 9.
- Cooperative measures to
assist National Technical Means
- 10.
- Restrictions on test and training launchers
- 11.
- Telemetry issues: data exchange, exemptions from the encapsulation
ban, signal strength
- 12.
- Strategic R&D boosters
- 13.
- Questions related to mobile ICBMs, including basing areas, categories of movements and
verification
- 14.
- Launchers on submarines undergoing overhaul and conversion
- 15.
- ICBM and SLBM warhead sublimits
- 16.
- Perimeter/Portal Continuous Monitoring, including the
establishment thereof
- 17.
- Suspect-site inspection
- 18.
- New kinds: ASBMs, ICCMs
- 19.
- Use of the terms “produce” and “develop”
- 20.
- Non-deployment of strategic offensive arms beyond the national
territory and verification thereof
- 21.
- Vehicles for launching objects into the upper atmosphere or space,
and limitations on the use of such vehicles
- 22.
- Non-deployed missiles and the conversion or elimination of such
missiles
- 23.
- Non-circumvention
- 24.
- Duration
- 25.
- Support equipment
- 26.
- Throw-weight
- 27.
- Unique identifiers
- 28.
- Pre-inspection movement restrictions
- 29.
- Definition of “inspection site”
- 30.
- Precision of coordinates in the MOU
- 31.
- Procedures for inspection before destruction of missiles in
canisters
- 32.
- Restructuring of the Inspection Protocol
[Page 675]
Attachment
Paper Prepared in the Delegation to the Nuclear and Space Talks in
Geneva3
OUTSTANDING START ISSUES NOT ON 32 ISSUES LIST
Major Issues
- 1.
- ALCMs
- 2.
- SLCMs
- 3.
- Follow-on negotiations
- 4.
- Heavy ICBMs
Other Issues
- 1.
- Heavy bomber definiton
- 2.
- Former heavy bomber definition
- 3.
- Elimination of warheads