No. 514.
Mr. Thomas
to Mr. Fish.
United
States Legation,
Lima,
Peru, May 17, 1874. (Received June
8.)
No. 106.]
Sir: I have the honor to inclose, for the
information of the Secretary of State, a report of a commission appointed by
the President of Peru to estimate the quantity of guano the property of
Peru. It will be perceived by the Secretary that this report has reference
to the province of Tarapaca alone. The commission will proceed to estimate
the guano deposits in other provinces of Peru, and will add doubtless very
much to the quantity which Peru has forsale. The deposits marked on thelist
with a red cross are the deposits made by J. T. Landreau. I am often asked
if the Government of the United States will urge the claim of J. C. Landreau
against Peru on account of these discoveries made by bis brother, J. T.
Landreau, and would be pleased to know from the Secretary what response I am
to give to these inquiries.
I am, &c,
[Page 801]
[Inclosure 1 in No. 106.]
Descriptive list of guano deposits in the littoral
province of Tarapaca, Peru, 1874.
huanillos.
|
Surfaces. |
Mean
heights. |
Quantities. |
|
|
m. |
|
a |
812.00 |
9.33 |
1795.96 |
b |
1266.00 |
5.60 |
7089.60 |
c. |
805.00 |
4.00 |
3220.00 |
d. |
1543.00 |
|
150780.50 |
e |
8160.00 |
f |
4960.00 |
g |
1312.00 |
h |
5500.00 |
i |
1722.00 |
j |
2624.00 |
|
95430.00 |
i |
2828.00 |
k |
4444.00 |
l |
3825.00 |
m |
1500.00 |
n |
900.00 |
o |
880.00 |
p |
2085 |
a′ |
2070.00 |
|
284002.00 |
b′ |
2943.00 |
c′ |
2618.00 |
de′ |
270.00 |
e′ |
942.00 |
f′ |
1026.00 |
g′ |
3400.00 |
h′ |
2490.00 |
i′ |
1227.00 |
j′ |
4531.00 |
k′ |
4004.00 |
l′ |
2500.00 |
m′ |
702.00 |
n′ |
2880.00 |
o′ |
270.00 |
p′ |
208.00 |
q′ |
400.00 |
r′ |
595.00 |
s′ |
336.00 |
t′ |
3136.00 |
|
119870.00 |
u′ |
1848.00 |
v′ |
10290.00 |
x′ |
8700.00 |
Add for small deposits outside the
polygon. |
|
|
32031.94 |
Sum total |
|
|
700000.00 |
patache.
On the plains |
15000.00 |
On the western mountain |
30000.00 |
On the table-land |
40000.00 |
On the different declivities |
40000.00 |
Sum total |
125000.00 |
patillos.
The
quantity in the different ravines is |
15000. mcc |
[Page 802]
punta de lobos.
|
Surfaces. |
Mean
heights. |
Quantities. |
a |
6142.00 |
|
54786.00 |
b |
2552.00 |
c |
1370.00 |
d |
2820.00 |
e |
4234.00 |
f |
4347.00 |
g |
1353.00 |
h |
4575.00 |
i |
18746.00 |
|
127497.00 |
j |
949.00 |
k |
22804.00 |
l |
4437.00 |
|
104350.00 |
m |
5500.00 |
n |
2424.00 |
o |
9145.00 |
p |
5346.00 |
q |
4740.00 |
r |
1854.00 |
s |
1059.00 |
t |
4376.00 |
u |
1358.00 |
v |
8648.00 |
|
593075.00 |
x |
4619.00 |
y |
5555.00 |
z |
3038.00 |
w |
1863.00 |
1 |
1414.00 |
|
1 |
231230.00 |
2 |
1950.00 |
3 |
7400.00 |
4 |
2366.00 |
5 |
4864.00 |
6 |
2860.00 |
7 |
2091.00 |
8 |
854.00 |
9 |
4046.00 |
10 |
2444.00 |
11 |
15957.00 |
12 |
927.00 |
|
336360.00 |
13 |
1950.00 |
14 |
7400.00 |
15 |
2660.00 |
16 |
1256.00 |
17 |
1926.00 |
18 |
589 00 |
19 |
6764.00 |
20 |
2600.00 |
21 |
1964.00 |
22 |
1836.00 |
|
220020.00 |
23 |
2500.00 |
24 |
918.00 |
25 |
10350.00 |
26 |
1972.00 |
27 |
3136.00 |
28 |
1290.00 |
At the point, and other deposits
outside the polygons |
|
|
98706.00 |
Sum total |
|
|
2265124.00 |
[Page 803]
The following quantities have been removed from this deposit:
From a to k ⅔ |
121522.00 |
From l to u ¼ |
150822.00 |
From v to w 1/6 |
98847.00 |
From 1 to 11¼ |
57807.50 |
From 12 to 21¼ |
84190.00 |
From 22 to 28¼ |
55005.00 |
Amount |
568233.50 |
Total
difference |
1696890.50 |
chipaua.
Part not worked.
|
Surfaces. |
Mean
heights. |
Quantities. |
|
|
m. |
|
a |
696.00 |
0.20 |
139.20 |
b |
1521.00 |
0.72 |
1095.12 |
c |
304.00 |
0.50 |
152.00 |
d |
2720.00 |
1.50 |
4080.00 |
e |
9028.00 |
2.00 |
18956.00 |
f |
2456.00 |
4.00 |
9624.00 |
g |
4420.00 |
2.00 |
8840.00 |
h |
3600.00 |
2.00 |
7380.00 |
i |
2500.00 |
1.70 |
4250.00 |
j |
3450.00 |
1.45 |
5002.50 |
k |
4226.00 |
1.00 |
4226.00 |
l |
6307.00 |
0.75 |
4730.25 |
Guano mixed with pebbles and other
foreign matter |
|
|
6290.00 |
Total |
|
|
74065.07 |
In the part worked.
1 |
6460.00 |
|
15735.00 |
2 |
1075.00 |
3 |
4800.00 |
4 |
3400.00 |
Sum total |
|
|
89800.07 |
pabellon de pica.
|
Surfaces. |
Mean
heights. |
Quantities. |
|
|
m. |
|
|
300000 |
20.00 |
6000000.00 |
Subtract 1/6 from this quantity on
account of stones |
|
|
1000000.00 |
Total
difference |
|
|
5000000.00 |
[Page 804]
chanavaya.
|
Surfaces. |
Mean
heights. |
Quantities. |
|
|
m. |
|
Quantity worked |
57500 |
5.00 |
287500.00 |
27500 |
5.00 |
137500.00 |
Total
difference |
|
|
150000.00 |
recapitulation.
Huanillos |
700000.00 |
Puntade Lobos |
1696890.50 |
Chiuaua |
89800.07 |
Pabellonde Pica |
5000000.00 |
Chanavava |
150000.00 |
Patache |
125000.00 |
Patillos |
15000.00 |
Total number of cubic meters |
7776690.57 |